Current location: ENGLISh > NEWS > Industry Trends >

 

Startup Procedure for Asphalt Pump

time:2011-12-07 10:38:17 author:特种泵阀 click:615

If the asphalt pump is motor-driven, its cut-off power shall not exceed the motor power, and it is started with a closed gate valve. The starting procedure is as follows:

Copyright © 2026-2027 Botou Special Pump Valve Manufacturing Co., Ltd.. All Rights Reserved Botou Special Pump Valve Manufacturing Co., Ltd.All Rights Reserved